Billet Valve cover
#1
Billet Valve cover
Is there any interest in people getting a billet valve cover?
Joe @ Locash CNC/Racing has said that if I can generate enough interest in these he'd be willing to make them. Below is the B series valve covers which are significantly cheaper because they are significantly less material and machine time.
Here's the latest version with stepped machining to taper down
Here's the older versions:
As for features, I'm thinking 2 -10 AN breather ports. Would people prefer them on the side or the front?
Cost would be $1500.
Joe @ Locash CNC/Racing has said that if I can generate enough interest in these he'd be willing to make them. Below is the B series valve covers which are significantly cheaper because they are significantly less material and machine time.
Here's the latest version with stepped machining to taper down
Here's the older versions:
As for features, I'm thinking 2 -10 AN breather ports. Would people prefer them on the side or the front?
Cost would be $1500.
#3
So the B series cover is half the price? GTFO.
http://www.locashdyno.com/store2/ind...roducts_id=366
http://www.locashdyno.com/store2/ind...roducts_id=366
#6
So the B series cover is half the price? GTFO.
http://www.locashdyno.com/store2/ind...roducts_id=366
http://www.locashdyno.com/store2/ind...roducts_id=366
Oh and to be clear, This would be Joe @ locash doing it, handling the payments blah blah blah. I'm just seeing if there is even any interest because I want one. I updated my OP because it's clear you couldn't understand it.
Trending Topics
#8
you guys have no idea when it comes to manufacturing... $1500 is dirt cheap for this piece. the material alone would be around $400. the machine time would likely be somewhere in the 20 hour range for a decent finish. if you were to go to a machine shop for something like this they would have to draw it up in cad first which would probably be about 4-5 hours and they would likely charge somewhere in the range of $2500-$3500.
aaron
aaron
#9
you guys have no idea when it comes to manufacturing... $1500 is dirt cheap for this piece. the material alone would be around $400. the machine time would likely be somewhere in the 20 hour range for a decent finish. if you were to go to a machine shop for something like this they would have to draw it up in cad first which would probably be about 4-5 hours and they would likely charge somewhere in the range of $2500-$3500.
aaron
aaron