African Lion VS. 42 Midgets
#13
I'm trying to run a Weibull failure analysis, and I'm going to have to come up with a different test-to-failure plan. I'm running out of midgets, and the lion is full, thus delaying testing. As it is right now, 1 midget v. lion = 1 cyle to failure and 2 midget v. lion also equals 1 cycle to failure, thus I have nothing but a flat line to predict reliability or mtbf.
#18
Originally Posted by SR71BB,May 10 2005, 03:48 PM
I'm trying to run a Weibull failure analysis, and I'm going to have to come up with a different test-to-failure plan. I'm running out of midgets, and the lion is full, thus delaying testing. As it is right now, 1 midget v. lion = 1 cyle to failure and 2 midget v. lion also equals 1 cycle to failure, thus I have nothing but a flat line to predict reliability or mtbf.
#20
The original problem had the lion listed as famished. This morning in the shower, I got the idea that I could use time instead of cycle count (x seconds before midget is eliminated) and that I can speed the process by removing the bodies before the lion has a chance to eat them.